Repair and clean up the damage to a solar farm that happened as a result of a wind event. Installed new solar panels to replace the damaged ones and did a drone IR scan to make sure that everything was operating properly.
Owner: Utah Municipal Power Agency Location: Spanish Fork, Utah Contract Amount: $1,526,335 Completion: September 2021
Type: Microgrid Location: Intermountain West Contract Amount: $2,110,931
Type: Hydro-Electric Location: Wasatch County, UT Contract Amount: $1,233,511
Type: Institutional Location: Salt Lake City, UT Contract Amount: $331,100